{"id":30784,"date":"2026-05-18T12:00:05","date_gmt":"2026-05-18T04:00:05","guid":{"rendered":"https:\/\/chimaytech.net\/8-critical-steps-for-installing-water-softener-val\/"},"modified":"2026-05-18T12:00:05","modified_gmt":"2026-05-18T04:00:05","slug":"8-critical-steps-for-installing-water-softener-val","status":"publish","type":"post","link":"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/","title":{"rendered":"8 Critical Steps for Installing Water Softener Valves in Industrial Applications"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_50 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Key_Takeaways\" title=\"Key Takeaways\">Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Introduction\" title=\"Introduction\">Introduction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_1_Site_Assessment_and_Preparation\" title=\"Step 1: Site Assessment and Preparation\">Step 1: Site Assessment and Preparation<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Structural_Requirements\" title=\"Structural Requirements\">Structural Requirements<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Drainage_Provisions\" title=\"Drainage Provisions\">Drainage Provisions<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_2_Piping_System_Design\" title=\"Step 2: Piping System Design\">Step 2: Piping System Design<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Pipe_Sizing\" title=\"Pipe Sizing\">Pipe Sizing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Pipe_Material_Selection\" title=\"Pipe Material Selection\">Pipe Material Selection<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_3_Valve_Installation\" title=\"Step 3: Valve Installation\">Step 3: Valve Installation<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Orientation\" title=\"Orientation\">Orientation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Brine_Tank_Positioning\" title=\"Brine Tank Positioning\">Brine Tank Positioning<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_4_Electrical_Installation\" title=\"Step 4: Electrical Installation\">Step 4: Electrical Installation<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Power_Requirements\" title=\"Power Requirements\">Power Requirements<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Wiring_Best_Practices\" title=\"Wiring Best Practices\">Wiring Best Practices<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_5_Initial_Startup\" title=\"Step 5: Initial Startup\">Step 5: Initial Startup<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Pre-Startup_Inspection\" title=\"Pre-Startup Inspection\">Pre-Startup Inspection<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Initial_Backwash\" title=\"Initial Backwash\">Initial Backwash<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_6_Control_Configuration\" title=\"Step 6: Control Configuration\">Step 6: Control Configuration<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Key_Parameters\" title=\"Key Parameters\">Key Parameters<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_7_System_Integration\" title=\"Step 7: System Integration\">Step 7: System Integration<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#PLC_Integration\" title=\"PLC Integration\">PLC Integration<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#SCADA_Integration\" title=\"SCADA Integration\">SCADA Integration<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Step_8_Maintenance_Planning\" title=\"Step 8: Maintenance Planning\">Step 8: Maintenance Planning<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Maintenance_Schedule\" title=\"Maintenance Schedule\">Maintenance Schedule<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/chimaytech.net\/ko\/8-critical-steps-for-installing-water-softener-val\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Key_Takeaways\"><\/span>Key Takeaways<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Improper installation causes <strong>45% of <a href=\"\/tag\/softener-valve\" target=\"_blank\"><strong>softener valve<\/strong><\/a> failures<\/strong> within two years<\/li>\n<li>Following proper procedures extends valve life by <strong>60%<\/strong> and reduces maintenance by <strong>USD 2,000-5,000 annually<\/strong><\/li>\n<li>Industrial installations require <strong>20-30% higher flow rates<\/strong> than residential, demanding reinforced components<\/li>\n<li>Bypass configuration prevents process interruptions and enables <strong>75% faster repairs<\/strong><\/li>\n<li>ChiMay&#39;s industrial valves support <strong>1 to 30 m\u00b3\/h<\/strong>, from commercial to large industrial applications<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Introduction\"><\/span>Introduction<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Water softener valves govern regeneration cycles maintaining resin effectiveness. The <strong>industrial softener market exceeds USD 2.4 billion<\/strong>, yet <strong>45% of failures<\/strong> trace to installation deficiencies.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_1_Site_Assessment_and_Preparation\"><\/span>Step 1: Site Assessment and Preparation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Structural_Requirements\"><\/span>Structural Requirements<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Industrial softener systems weigh <strong>500-2,000 kg<\/strong> when filled. Floor structures must support loads without settlement.<\/p>\n<p><strong>Clearance Requirements<\/strong>:<\/p>\n<ul>\n<li><strong>Front clearance<\/strong>: Minimum <strong>1 meter<\/strong> for control head access<\/li>\n<li><strong>Side clearance<\/strong>: <strong>0.5 meters<\/strong> for piping connections<\/li>\n<li><strong>Top clearance<\/strong>: <strong>0.75 meters<\/strong> for resin loading<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Drainage_Provisions\"><\/span>Drainage Provisions<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><strong>Floor drains<\/strong>: Handle peak backwash flow (<strong>50-150 L\/min<\/strong>)<\/li>\n<li><strong>Overflow drains<\/strong>: Handle combined flow from multiple vessels<\/li>\n<li><strong>Backflow prevention<\/strong>: Install air gaps per plumbing codes<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Step_2_Piping_System_Design\"><\/span>Step 2: Piping System Design<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Pipe_Sizing\"><\/span>Pipe Sizing<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Calculate based on peak demand: <strong>Q<em>peak = Q<\/em>average \u00d7 Peak Factor<\/strong> (typically <strong>1.5-2.5<\/strong> for industrial)<\/p>\n<p>Total system pressure drop should not exceed <strong>0.5-1.0 bar<\/strong>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Pipe_Material_Selection\"><\/span>Pipe Material Selection<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table border=\"1\" cellpadding=\"5\" cellspacing=\"0\">\n<thead>\n<tr>\n<th>Material<\/th>\n<th>Advantages<\/th>\n<th>Best Applications<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>PVC\/CPVC<\/strong><\/td>\n<td>Low cost, chemical resistance<\/td>\n<td>Secondary systems<\/td>\n<\/tr>\n<tr>\n<td><strong>Stainless Steel 316L<\/strong><\/td>\n<td>High strength, corrosion resistance<\/td>\n<td>High temperature, critical<\/td>\n<\/tr>\n<tr>\n<td><strong>HDPE<\/strong><\/td>\n<td>Flexibility, chemical resistance<\/td>\n<td>Buried piping<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Step_3_Valve_Installation\"><\/span>Step 3: Valve Installation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Orientation\"><\/span>Orientation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Industrial valves are designed for <strong>vertical (top-mount)<\/strong> installation with <a href=\"\/tag\/control-valve\/\" target=\"_blank\"><strong>control valve<\/strong><\/a> on mineral tank top.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Brine_Tank_Positioning\"><\/span>Brine Tank Positioning<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Position <strong>minimum 12 inches<\/strong> below softener valve<\/li>\n<li>Locate <strong>within 3 meters<\/strong> of valve for reliable brine injection<\/li>\n<li>Ensure <strong>unobstructed top access<\/strong> for salt loading<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Step_4_Electrical_Installation\"><\/span>Step 4: Electrical Installation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Power_Requirements\"><\/span>Power Requirements<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><strong>Timer\/Control<\/strong>: <strong>24 VAC<\/strong> from Class 2 transformer<\/li>\n<li><strong>Drive Motor<\/strong>: <strong>115 VAC or 24 VDC<\/strong><\/li>\n<li><strong>Auxiliary<\/strong>: Solenoid valves, indicators, communication<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Wiring_Best_Practices\"><\/span>Wiring Best Practices<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Use appropriately sized conduit for environment<\/li>\n<li>Maintain <strong>separation from power wiring<\/strong><\/li>\n<li>Verify ground resistance <strong>&lt;25 ohms<\/strong><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Step_5_Initial_Startup\"><\/span>Step 5: Initial Startup<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Pre-Startup_Inspection\"><\/span>Pre-Startup Inspection<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>All connections properly torqued and sealed<\/li>\n<li>Drain lines clear and properly sized<\/li>\n<li>Electrical connections secure<\/li>\n<li>Control valve in <strong>bypass position<\/strong><\/li>\n<li>Inlet water valve closed<\/li>\n<li>Salt loaded in brine tank<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Initial_Backwash\"><\/span>Initial Backwash<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Slowly open inlet with valve in bypass<\/li>\n<li>Allow vessel fill, bleed air through top<\/li>\n<li>Transition to <strong>backwash position<\/strong><\/li>\n<li>Backwash for <strong>10-15 minutes<\/strong> until clear<\/li>\n<li>Verify drain flow rate<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Step_6_Control_Configuration\"><\/span>Step 6: Control Configuration<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Key_Parameters\"><\/span>Key Parameters<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table border=\"1\" cellpadding=\"5\" cellspacing=\"0\">\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Typical Range<\/th>\n<th>Notes<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Service Flow Rate<\/td>\n<td>1-30 m\u00b3\/h<\/td>\n<td>Set to design capacity<\/td>\n<\/tr>\n<tr>\n<td>Capacity per Cycle<\/td>\n<td>50-500 m\u00b3\/degree<\/td>\n<td>Based on resin volume<\/td>\n<\/tr>\n<tr>\n<td>Regeneration Trigger<\/td>\n<td>Volume or time<\/td>\n<td>Volume preferred<\/td>\n<\/tr>\n<tr>\n<td>Backwash Duration<\/td>\n<td>10-20 minutes<\/td>\n<td>Adjust for temperature<\/td>\n<\/tr>\n<tr>\n<td>Brine Draw Time<\/td>\n<td>30-90 minutes<\/td>\n<td>Based on tank height<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Step_7_System_Integration\"><\/span>Step 7: System Integration<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"PLC_Integration\"><\/span>PLC Integration<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><strong>Hardwired signals<\/strong>: Regeneration initiation, alarm output, remote start<\/li>\n<li><strong>Network integration<\/strong>: Modbus registers, diagnostics, remote configuration<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"SCADA_Integration\"><\/span>SCADA Integration<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><strong>Real-time monitoring<\/strong>: Flow rates, pressure, status<\/li>\n<li><strong>Alarm management<\/strong>: Automatic alerting<\/li>\n<li><strong>Historical logging<\/strong>: Trend analysis<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Step_8_Maintenance_Planning\"><\/span>Step 8: Maintenance Planning<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Maintenance_Schedule\"><\/span>Maintenance Schedule<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table border=\"1\" cellpadding=\"5\" cellspacing=\"0\">\n<thead>\n<tr>\n<th>Task<\/th>\n<th>Frequency<\/th>\n<th>Responsible<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Salt level check<\/td>\n<td>Weekly<\/td>\n<td>Operations<\/td>\n<\/tr>\n<tr>\n<td>Salt refill<\/td>\n<td>Monthly<\/td>\n<td>Operations<\/td>\n<\/tr>\n<tr>\n<td>Salt bridge inspection<\/td>\n<td>Quarterly<\/td>\n<td>Maintenance<\/td>\n<\/tr>\n<tr>\n<td>Injector cleaning<\/td>\n<td>Semi-annually<\/td>\n<td>Maintenance<\/td>\n<\/tr>\n<tr>\n<td>Full valve service<\/td>\n<td>Annually<\/td>\n<td>Technician<\/td>\n<\/tr>\n<tr>\n<td>Control rebuild<\/td>\n<td>Every 3-5 years<\/td>\n<td>Service<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Proper installation requires attention to eight critical steps. The <strong>45% failure rate<\/strong> from installation deficiencies underscores the importance of established procedures.<\/p>\n<p>ChiMay&#39;s industrial valves combine robust construction with advanced control capabilities. Following installation best practices achieves <strong>60% improvement in service life<\/strong> and <strong>USD 2,000-5,000 annual maintenance savings<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Key Takeaways Improper installation causes 45% of <a href=\"\/tag\/softener-valve\" target=\"_blank\"><strong>softener valve<\/strong><\/a> failures within two years Following proper procedures extends valve life by 60% and reduces maintenance by USD 2,000-5,000 annually Industrial installations require 20-30% higher flow rates than residential, demanding reinforced components Bypass configuration prevents process interruptions and enables 75% faster repairs ChiMay&#39;s industrial valves support 1&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false},"categories":[1],"tags":[87979],"translation":{"provider":"WPGlobus","version":"2.12.0","language":"ko","enabled_languages":["en","es","de","fr","ru","pt","ar","ja","ko","it","id","hi","th","vi","tr"],"languages":{"en":{"title":true,"content":true,"excerpt":false},"es":{"title":false,"content":false,"excerpt":false},"de":{"title":false,"content":false,"excerpt":false},"fr":{"title":false,"content":false,"excerpt":false},"ru":{"title":false,"content":false,"excerpt":false},"pt":{"title":false,"content":false,"excerpt":false},"ar":{"title":false,"content":false,"excerpt":false},"ja":{"title":false,"content":false,"excerpt":false},"ko":{"title":false,"content":false,"excerpt":false},"it":{"title":false,"content":false,"excerpt":false},"id":{"title":false,"content":false,"excerpt":false},"hi":{"title":false,"content":false,"excerpt":false},"th":{"title":false,"content":false,"excerpt":false},"vi":{"title":false,"content":false,"excerpt":false},"tr":{"title":false,"content":false,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/posts\/30784"}],"collection":[{"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/comments?post=30784"}],"version-history":[{"count":0,"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/posts\/30784\/revisions"}],"wp:attachment":[{"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/media?parent=30784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/categories?post=30784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chimaytech.net\/ko\/wp-json\/wp\/v2\/tags?post=30784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}